Inventgeeklogo




Follow Inventgeek on:
Twitter Invengeek Link

Facebook Invengeek Link

Youtube Invengeek Link



Valid XHTML 1.0 Transitional 

Step one is to modify the top of our upright pole. To do this we used some cutters to make a notch the and then drilled 2 holes a inch from the top and an inch below that for zip tie mounting points.



Next we will find the center of our aluminum U channel pipe and using our sprocket as a guide drill 2 holes for our screws.



Here we have the sprocket mounted to the aluminum main arm and the motor attached for a test fit for clearances.
Now its time to start assembling our components. Here we can see how the frames base is assembled using the 3 T fittings.
Next we will mount the main drive motor (without the arm to make our lives easier) to the top of the upright. I used 2 screws in this model of motor to create a strong mounting point.
OverView | Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Summary